Pre-Conference Masterclass: Beyond Data Centers: Unlocking the $25 Billion Heat Pump Power Market with Fault-Managed Power
Member Price: $185
Non-Member Price: $275
Data centers are reshaping the digital world, but much of that work remains out of reach for most ICT professionals. At the same time, the transition from gas heating to electric heat pumps in buildings represents an equally large, yet far less recognized opportunity. Fault Managed Power (FMP) opens the door for low-voltage and network designers to participate directly in this $25 billion market. In this Masterclass, attendees learn the physical and economic drivers behind market demand, how traditional AC distribution creates costly and disruptive barriers, and why FMP combined with energy management will often be the only practical way to complete these projects. Through case studies, calculators, reference designs, and real-world lessons, participants gain a clear framework for determining when FMP makes sense, when it doesn’t, and how to present the value proposition to owners, engineers, and contractors. Attendees leave with practical design knowledge, financial and market insights, and strategies to expand their scope of work in green building projects.
Date & Time
Sunday January 18th, 2026 8:00am EST
End Date & Time
Sunday January 18th, 2026 11:30am EST
AbilityLevel
Master
Duration
3 Hours
Format
Masterclass (3
SessionType
Pre-Conference Masterclass
SessionNumber
001
Category Sessions
Event Attendees
1
Going
0
Interested
Event Comments